Our Clients
This is a list of some of our most noteworthy clients, but is not an exhaustive list of work performed.
Georgia College & State University
Dyer Construction has provided dozens of services for GCSU over many years. Some of the more recent projects have included a complete construction of the Arts and Sciences Courtyard, a remodel of the Dean’s Office, and West Campus Summer Turnover renovations. For images related to recent Georgia College projects, check out our Government Projects.
Exchange Bank
This facility was designed to include a cast-in-place security vault and contemporary include finishes. Dyer Construction, Inc. has the ability to construct facilities that are complex in construction details. Along with our in-house staff, we have a diverse pool of qualified and mostly local sub-contractors. One of which, featured here, is central Georgia’ s most sought-after brick and block masonry company, Lamar Brick and Block Construction.
Zschimmer & Schwarz
Dyer Construction has completed several projects for the chemical manufacturer Zschimmer Schwarz. We are currently in he process of constructing a water treatment facility in Milledgeville and a new industrial plant in Gordon. Past projects have included a new warehouse, a tank farm for storage, and a complete remodel of their offices. For images related to Zschimmer Schwarz projects, check out our Industrial Portfolio.
The Club at Lake Sinclair
Dyer Construction completed a complete remodel and redesign of the clubhouse at the Club at lake Sinclair. This renovation brought the existing building down to bare studs and allowed our company to create an atmosphere of luxury and prestige that would positively effect the guests. You can see the full renovation in our Commercial Portfolio.
Georgia War Veterans Home
Our latest project at GWVH consisted of asbestos abatement, new finishes floors, wall, and ceilings, a reconfigured bathroom, and a new nurse call system in Russell Building on levels two, three and four. Asbestos abatement, a new floor, a new nurse call system, and select repairs were also completed in the Vinson Building on levels two and three. In the Wood Building a new emergency generator was installed with new sidewalks and grass.