This project consisted of asbestos abatement, new finishes floors, wall, and ceilings, a reconfigured bathroom, and a new nurse call system in Russell Building on levels two, three and four. Asbestos abatement, a new floor, a new nurse call system, and select repairs were also completed in the Vinson Building on levels two and three. In the Wood Building a new emergency generator was installed with new sidewalks.